J'ai postulé en ligne. Le processus a pris 2 mois. J'ai passé un entretien chez Schneider Electric (Toronto, ON) en nov. 2012
Entretien
Had first interview on phone. After 2 weeks, was invited to mass hiring interview, with around 15 other applicant for various positions. It was a whole day event, presentation, tours and 2 1hr interviews. Was a fun interactive day and everyone was very friendly. Waiting for a response from them (was told, would take 3 weeks)
Questions d'entretien [1]
Question 1
How comfortable are you to be in a field job, away from desk
J'ai postulé en ligne. Le processus a pris 3 semaines. J'ai passé un entretien chez Schneider Electric (Riyad) en mars 2026
Entretien
The interview deeply covered data center cooling maintenance and systematic troubleshooting strategies for CRAC/Chilled Water units. We discussed handling emergency failures, maintaining N+1 redundancy, and optimizing system performance under high ambient temperatures. It was a high-level technical exchange that reflected the company's focus on operational reliability
J'ai passé un entretien chez Schneider Electric (Edmonton, AB)
Entretien
First, got a e-mail to book an interview, then HR video interview, and waiting for the notice to conduct interview with the hiring manager, finally Engineering Manager face to face interview.
Questions d'entretien [1]
Question 1
Do you want to transfer to management role in the future?
J'ai postulé en ligne. J'ai passé un entretien chez Schneider Electric (Singapour)
Entretien
q&A with technical question the most. take about 1 hour. Interviewer was experienced. mostly shared past experiences. 2 round of interview. not offered the job. big workspace and nice company environment.
Questions d'entretien [1]
Question 1
please introduce yourself and tell me about your experiences.