J'ai postulé en personne. Le processus a pris 5 jours. J'ai passé un entretien chez Gates Corporation (Denver, CO)
Entretien
Basic interview with lab manager was quick and detailed. Everything was well planned and we toured the facilities, labs, and offices. We met with multiple engineers in the support groups and talked with all the technicians in the lab where I would be assigned.
Questions d'entretien [1]
Question 1
Do you have experience with sound measuring equipment, machine tools, calibration, etc.? What makes you think you can step into this position with your feet on the ground and running?
Le processus a pris 1 jour. J'ai passé un entretien chez Gates Corporation en févr. 2012
Entretien
The phone interview had been performed by engineering manager. Technical questions were covered mostly. The development process and solving problem experience and strategy were asked.
Questions d'entretien [1]
Question 1
What was the most difficult project ever experienced and why?